A people's movement · Goa

Goyant
Kollso
Naka

KONKANI · "NO COAL IN GOA"

Port expansion, river dredging, rail double-tracking and new highways are being built to move coal through Goa's villages, forests and khazan lands. We are the Goans standing in the way.

Hand-painted placard reading 'Amchea tondant shen — Kolso Naka'
A protest placard in Konkani: "Amchea tondant shen… Kolso Naka."

The numbers

"No new coal" is not what the permissions say

The State says no additional coal handling has been approved. GKN put the government's own clearances in front of the press on 12 November 2025. Here is the scale of what has been cleared or planned, in million tonnes per annum (MTPA).

14 → 19 m

Capital dredging of Vasco Bay, cleared by MoEF&CC on 21 July 2025, so cape-size ships can unload far more coal.

60 m

Width of the new highway and Borim Bridge through cultivated khazan land at Loutulim. The PWD approval records that "Mormugao Port is priority".

Xelvona

A coal-handling jetty still before the State Environment Impact Assessment Authority. Only local protest has stalled it.

Mollem

NH-4A widening and SWR double-tracking through Bhagwan Mahavir Wildlife Sanctuary and National Park, the coal route to Karnataka.

Source: GKN press note and press conference, Margao Municipality, 12 Nov 2025; reported in O Heraldo and The Goan, 13 Nov 2025.

The corridor

One line, from the harbour to the ghats

Each project looks separate on paper. Put them on one map and they form a single coal route: bigger ships into Vasco Bay, a doubled railway through the coastal villages and Salcete, and a widened road and rail line across the Mollem forests into Karnataka.

VASCO BAY Mormugao Port 7→14 MTPA DREDGING 19 m Cansaulim TRESPASS · NOV 2025 Velsao LAND UNDER DISPUTE 20+ HOMES CUT OFF Madgaon JUNCTION Chandor NIGHT VIGIL · 2020 Kulem DOUBLING FROM VASCO Mollem WILDLIFE SANCTUARY NH-4A + RAIL To Karnataka Loutulim khazan highway & Borim Bridge and the Xelvona jetty feed the same port-bound traffic by road and river
Active fight on the ground South Western Railway line being doubled Through protected forest

Schematic, not to scale.

On the ground

Where the line meets people's land

Chandor railway gate · Salcete · 1–2 November 2020

Chandor: the night Goa sat on the tracks

On the night of 1 November 2020, more than 5,000 people walked by candlelight to the railway gate at Chandor, with drums and slogans, to oppose the double-tracking of the line. They held the tracks in an all-night vigil until about 5 am. The coal trains that usually pass through in the dead of night did not run.

The vigil was called under the banner Goyant Kollso Naka. It opposed three projects cutting through Mollem: the rail double-tracking, the NH-4A widening and a 400 kV transmission line. People came from across Goa and across party lines.

Opposition leader Digambar Kamat and Goa Forward's Vijai Sardesai joined the crowd, and people travelled from as far as North Goa.

Police later booked the conveners for unlawful assembly. Goans answered with #ArrestMeToo, asking why a peaceful vigil was being called a riot. The case against ten activists went to trial before the Judicial Magistrate First Class in Margao.

Primeirovaddo, Velsao · Salcete

Velsao: building on land they do not hold

Goa's smallest village is where the second railway track is being pushed hardest. Landowners and the church hold title documents dating to the Portuguese era, still issued by the Revenue Department. South Western Railway has taken the village panchayat, the Fabrica and 44 other landowners to the Inspector of Survey and Land Records in Margao, and the villagers have gone to the District Court.

With both cases pending, work began on pylon foundations on Christmas Day 2025. On 2 January 2026 villagers stopped the contractors, the sarpanch and panchas came to the site and the panchayat issued a stop-work order. RVNL resumed the next morning.

  • The railways do not have possession of this land.
  • The works now block the only access to more than 20 homes.
  • Villagers held a peaceful protest at the Velsao railway crossing on 10 August 2026.

Cansaulim station · Mormugao

Cansaulim: walls down, trees felled, no notice

In November 2025 RVNL machinery entered private ancestral property beside Cansaulim railway station for an underpass linked to double-tracking. A heritage boundary wall was demolished, a water-carrying nullah destroyed and fruit-bearing trees cut. No land-acquisition notice had been issued and no compensation offered.

The landowner's police complaint of 20 November saw no action until the South Goa MP wrote to the police directing that an FIR be registered. Residents and GKN members gathered at the site on 23 November. SWR published its land-acquisition notice six days later.

Bhagwan Mahavir Wildlife Sanctuary · Sanguem & Dharbandora

Mollem: the forest in the way

The Supreme Court has already refused permissions for double-tracking inside protected areas, noting that Krishnapatnam Port is a better alternative for coal. The State keeps coming back. In December 2025 and again in March 2026 the National Board for Wildlife cleared ore handling inside the sanctuary, including at Kalem railway yard. In 2026 the Government sought to lift curbs on forest land for the Kulem–Kalem doubling, and revived four-laning of the highway through Mollem with some 7,000 trees at risk.

In April 2026 the Centre deferred the fresh bid for the Mollem double-tracking nod, citing gaps in the Wildlife Institute of India study.

Vasco · Mormugao · the coastal villages

The coast, the rivers and the air

Residents along the rail route report coal dust from open rakes and falling coconut yields, and Mormugao residents have demanded an immediate halt to coal handling. In January 2026 the draft Coastal Zone Management Plan 2019 maps reached village panchayats with six days for comments. Residents of Arossim, Benaulim and other villages wrote to the Director of Environment asking for at least 60 days.

There have been gains. In February 2026 Goa won back jurisdiction over six waterways under an MoU with the Inland Waterways Authority, one of the demands raised at Lohia Maidan.

Watch

Filmed by the people who live there

Footage shared by residents and members. Tap to play.

10 FEB 2026 · LOK SABHASouth Goa MP Capt. Viriato Fernandes raises coal transportation and unplanned mega-projects in the Union Budget debate.

3 FEB 2026 · VELSAOThe day's "development" at Primeirovaddo: ballast dumped along the new track bed.

2 JAN 2026 · VELSAOContractors' trucks on land the villagers hold title to, the day they were sent back.

3 JAN 2026 · VELSAOExcavation resumes at Primeirovaddo despite the panchayat's stop-work order.

JAN 2026 · CANSAULIMCAC United explains what happened at Cansaulim station, and why the landowner waited days for an FIR.

JAN 2026 · CANSAULIM–AROSSIM–CUELIMTaps ran dry for 36 hours while large housing projects keep getting approved.

DEC 2025 · AROSSIM, WARD 6Construction running at night, past the 8 am–6 pm hours set by the Pollution Control Board.

In the press

What the papers reported

Tap a clipping to read it full size.

Timeline

From Chandor to Velsao

  1. Midnight vigil at the Chandor railway gate

    More than 5,000 people hold the tracks from 10 pm to 5 am against double-tracking. No coal train passes. Police later book the conveners; Goans respond with #ArrestMeToo.

  2. Mass meeting at Lohia Maidan, Margao

    Goans from across the State gather against coal. Demands are agreed that GKN vows to pursue until they are met.

  3. Press conference at Margao Municipality

    GKN sets out the clearances behind the "no new coal" claim, challenges the Chief Minister to an open debate and offers a presentation to every MLA.

  4. RVNL enters private land at Cansaulim

    A heritage wall, a nullah and fruit trees are destroyed. Residents gather at the site on 23 November; the MP directs police to register an FIR.

  5. SWR publishes land-acquisition notice

    The notice comes after the works had already begun.

  6. Pylon foundations begin at Velsao

    Work starts on Christmas Day on land under dispute before the District Court and the ISLR.

  7. Velsao sends the contractors back

    Villagers stop the excavation and the panchayat issues a stop-work order. RVNL resumes the next day.

  8. Six days to comment on the coastal plan

    Draft CZMP 2019 maps reach panchayats with a 20 January deadline. Residents write to the Director of Environment demanding 60 days.

  9. Public interaction with Justice Ferdino Rebello

    Villagers of Chandor, Guirdolim and neighbouring villages raise their issues at Chandor Club Hall.

  10. Coal raised in Parliament

    The South Goa MP raises coal transportation and unplanned mega-projects in the Lok Sabha budget debate.

  11. Goa wins back six waterways

    An MoU with the Inland Waterways Authority restores State control over the Mandovi, Zuari and four other rivers.

  12. Diana Tavares passes away

    The movement loses one of its strongest voices.

  13. Mollem double-tracking nod deferred

    The Centre defers Goa's fresh bid, citing gaps in the wildlife study.

  14. Peaceful protest at Velsao railway crossing

    Villagers whose only access has been blocked assemble under Article 19 to demand the government step in.

Diana Tavares standing in a canoe, poling across a river

In memory

Diana Tavares

DIED 27 FEBRUARY 2026 · LAID TO REST AT OUR LADY OF SNOWS, RACHOL

"Spirit is alive, and will be alive to our commitments given to our tiny little Goa."

Diana studied every issue she took on and saw it through to its end. She stood with village after village against the land, coal and sand mafias, and for fourteen years was part of most of the Save Goa movements. When the Leader of the Opposition asked the Assembly to record her passing, he said her work had protected Goa's plateaus, rivers and green areas.

Even from a hospital bed she asked us not to wait for her: "Let us unite Goa to fight against it." We intend to.

How we work

Rules for a people's movement

Past movements in Goa were captured by electoral interests. These principles were set down in January 2026 so that this one belongs to the people of Goa.

  1. Decisions by consensus

    The charter of demands and the strategy follow the common wishes of Goans. No person, committee or smaller group decides without the general assembly.

  2. Allegiance to Goa

    Everyone joins to give, not to take. Personal and divisive goals are dropped at the door.

  3. Unity

    No divisive words or actions. Members set aside party and religious affiliations inside the movement.

  4. Replace false narratives

    Every false narrative is answered with the record: clearances, court orders, notices and photographs.

  5. The land communities lead

    Spokespersons come from the communities whose land is at stake, backed by experts, activists and parties rather than led by them.

What you can do

Kollso naka. Say it where it counts

112

Report night work

Construction in settlement areas must stop at 6 pm. If machinery is running after that, dial 112 to register a police complaint, then share the photo, video and location with your village group.

Gram Sabha

Show up and ask

Zoning changes, conversions and project approvals pass when the hall is empty. Attend your gram sabha and put your question on record.

Objections

Use every consultation

CZMP maps, EIA hearings, land-acquisition notices and 39A conversions all carry a window for objections. Ask your panchayat for the notice the day it arrives.